Train operation by signal indication in either direction on both tracks; two interlockings removed; economies accomplished by centralized control installation; track and signal plan of controlled territory; new method of operation of system. (see also Ry. Signaling, vol. 23, no. 4, Apr. 1930, pp. 135-137, 8 figs)
Burlington completes centralized control system on nine miles of double track
Ry. Age
Railway Age ; 88 , n 14
1930
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington completes centralized control system on nine miles of double track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|