Train operation by signal indication in either direction on both tracks; two interlockings removed; economies accomplished by centralized control installation; track and signal plan of controlled territory; new method of operation of system. (see also Ry. Signaling, vol. 23, no. 4, Apr. 1930, pp. 135-137, 8 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Burlington completes centralized control system on nine miles of double track


    Additional title:

    Ry. Age


    Contributors:
    Zane, W.F. (author)

    Published in:

    Railway Age ; 88 , n 14


    Publication date :

    1930


    Size :

    3 pages


    Remarks:

    4 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English







    Centralized traffic control installed on 39 miles of Burlington

    Zane, W.F. | Engineering Index Backfile | 1943


    Centralized traffic control installed on 39 miles of Burlington

    Zane, W.F. | Engineering Index Backfile | 1943