Trains directed by signal indication and six operators relieved in system involving two switches; description of system and how it operates; selector system used for control; how train movements are directed.
Burlington installs centralized control for ends of double track
Ry. Age
Railway Age ; 85 , n 26
1928
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Burlington installs modified CTC
Engineering Index Backfile | 1959
Burlington installs modified CTC
Engineering Index Backfile | 1959
Burlington completes centralized control system on nine miles of double track
Engineering Index Backfile | 1930
|