Information on centralized traffic control system used on Chicago, Burlington and Quincy to reduce first costs in proportion to requirements for operation of 10 to 12 trains daily; power switch at one end of each siding and spring switch at other end, is main feature. (see also Ry Age v 146 n 24 June 15 1959 p 18)
Burlington installs modified CTC
Ry Signaling Communications
Railway Signaling and Communications ; 52 , n 4
1959
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs extensive new electric interlocking
Engineering Index Backfile | 1932
|Burlington installs extensive interlocking at Kansas City
Engineering Index Backfile | 1951
Burlington installs new classification yard at Lincoln, Neb
Engineering Index Backfile | 1944
|Burlington installs new westbound classification yard at Galesburg, Ill.
Engineering Index Backfile | 1943
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|