Two interlockings eliminated; delays shortened; running time reduced; savings of 19 per cent; track and signal plan of centralized traffic control territory between Red Oak and Balfour. (See also Ry. Age vol. 89, no. 9, Aug. 30, 1930 pp. 439-442, 3 figs)
Burlington installs centralized traffic control on 24 miles of single track
Ry. Signaling
Railway Signaling ; 23 , n 9
1930
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Pennsylvania installs centralized traffic control on 30.3 miles of single track
Engineering Index Backfile | 1931
Pennsylvania installs centralized control on 30.3 miles of single track
Engineering Index Backfile | 1930
Missouri pacific installs centralized traffic control on 32 miles of double track
Engineering Index Backfile | 1931
Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|