Pennsylvania has completed installation of centralized traffic control between Ben Davis, Ind., and Almeda, which is portion of main line between Indianapolis, Ind., and St. Louis, Mo.; characteristics of line and traffic; 12 min. saved on each freight train stop; second tracking deferred; first installation of Union three-wire coded system.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Pennsylvania installs centralized control on 30.3 miles of single track


    Additional title:

    Ry. Signaling


    Published in:

    Publication date :

    1930


    Size :

    3 pages


    Remarks:

    4 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English