Train operation by signal indication in either direction on both tracks; two interlockings removed; economies accomplished by centralized control installation; track and signal plan of controlled territory; new method of operation of system. (See also Ry. Age vol. 88, no. 14, Apr. 5, 1930 pp. 812-814, 4 figs)
Burlington completes centralized control system on nine miles of double track
Ry. Signaling
Railway Signaling ; 23 , n 4
1930
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington completes centralized control system on nine miles of double track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Burlington installs centralized control for ends of double track
Engineering Index Backfile | 1928