Details of centralized traffic control installed on single track section between Aurora, Ill, and Steward Junction, by Chicago, Burlington and Quincy Railroad; traffic capacity increased and average time of all trains reduced. (see also Ry Age v 114 n 19 May 8 1943 p 811-4)
Centralized traffic control installed on 39 miles of Burlington
Ry Signaling
Railway Signaling ; 36 , n 4
1943
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Burlington installs centralized traffic control on 24 miles of single track
Engineering Index Backfile | 1930
|Centralized traffic control installed on 64.6 miles of Seaboard
Engineering Index Backfile | 1943
Centralized traffic control installed on 64.6 miles of Seaboard
Engineering Index Backfile | 1943