As means for increasing track capacity and reducing train time, Seaboard has installed centralized traffic control on single track main line south from Savannah, Ga, to Thalmann; details of installation. (see also Ry Age v 114 n 20 May 15 1943 p 942-6)
Centralized traffic control installed on 64.6 miles of Seaboard
Ry Signaling
Railway Signaling ; 36 , n 5
1943
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control installed on 64.6 miles of Seaboard
Engineering Index Backfile | 1943
Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Centralized traffic control installed on 39 miles of Burlington
Engineering Index Backfile | 1943
|Centralized traffic control installed on wabash
Engineering Index Backfile | 1931
Centralized traffic control installed on alton
Engineering Index Backfile | 1934