This report, conducted jointly by Parsons, Partex, P&T, AMR Training and Consulting, CAPDI, and ABWV, was funded by the U.S. trade and Development Agency. The report covers the results of a feasibility study conducted for the purpose of adding four potential business activities associated with the aviation operations at the Macau International Airport. The areas covered included cargo handling, aircraft maintenance, avionics/spare parts and an aviation training facility. The study also provides an economic overview of the region and details a revenue and financial analysis. The report is divided into the following sections: Executive Summary (1) Introduction (2) Passenger, Cargo And Maintenance Forecasts (3) Cargo Facilities (4) Aircraft Maintenance Facilities (5) Spare Parts Distribution (6) Aviation Training (7) Capital And Operational Cost Estimates (8) Revenue Analysis And Financial Analysis (9) Optimum Sizing Of Projects (10) Macanese Personnel Training.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Macau International Airport Feasibility Study Phase 2 Expansion. Final Report


    Publication date :

    1995


    Size :

    502 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English