This report, conducted jointly by Parsons, Partex, P&T, AMR Training and Consulting, CAPDI, and ABWV, was funded by the U.S. trade and Development Agency. The report covers the results of a feasibility study conducted for the purpose of adding four potential business activities associated with the aviation operations at the Macau International Airport. The areas covered included cargo handling, aircraft maintenance, avionics/spare parts and an aviation training facility. The study also provides an economic overview of the region and details a revenue and financial analysis. The report is divided into the following sections: Executive Summary (1) Introduction (2) Passenger, Cargo And Maintenance Forecasts (3) Cargo Facilities (4) Aircraft Maintenance Facilities (5) Spare Parts Distribution (6) Aviation Training (7) Capital And Operational Cost Estimates (8) Revenue Analysis And Financial Analysis (9) Optimum Sizing Of Projects (10) Macanese Personnel Training.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Macau International Airport Feasibility Study Phase 2 Expansion. Final Report


    Erscheinungsdatum :

    1995


    Format / Umfang :

    502 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch