Illustrated description of effect of bombing and repair of viaduct on Southern Railway near Brighton; it is constructed of brick and consists of 27 arches; it took about 18 mo to complete and contains 8,000,000 bricks; rails are at height of about 70 ft above ground level; heavy bomb caused collapse of pier and of two arches which it supported; method of repair. (see also Engineering v 156 n 4066 Dec 17 1943 p 487-8, (illustrations) 490; Engineer v 176 n 4588 Dec 17 1943 p 484-5; Civ Eng (Lond) v 39 n 452 Feb 1944 p 39-41)
Repair of bombed railway viaduct
Ry Gaz
Railway Gazette and Railway News ; 80 , n 1
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Online Contents | 2011
|Columns - Now that the Dots Have Bombed...
Online Contents | 2001
|