Illustrated description of effect of bombing and repair of viaduct on Southern Railway near Brighton; it is constructed of brick and consists of 27 arches; it took about 18 mo to complete and contains 8,000,000 bricks; rails are at height of about 70 ft above ground level; heavy bomb caused collapse of pier and of two arches which it supported; method of repair. (see also Engineering v 156 n 4066 Dec 17 1943 p 487-8, (illustrations) 490; Engineer v 176 n 4588 Dec 17 1943 p 484-5; Civ Eng (Lond) v 39 n 452 Feb 1944 p 39-41)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Repair of bombed railway viaduct


    Additional title:

    Ry Gaz


    Published in:

    Publication date :

    1944


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1944


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1943


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1943


    The Day Japan Bombed Oregon

    Goyer, Norm | Online Contents | 2011


    Columns - Now that the Dots Have Bombed...

    Schroer, Ron | Online Contents | 2001