Illustrated description of effect of bombing and repair of viaduct on Southern Railway near Brighton; it is constructed of brick and consists of 27 arches; it took about 18 mo to complete and contains 8,000,000 bricks; rails are at height of about 70 ft above ground level; heavy bomb caused collapse of pier and of two arches which it supported; method of repair. (see also Engineering v 156 n 4066 Dec 17 1943 p 487-8, (illustrations) 490; Engineer v 176 n 4588 Dec 17 1943 p 484-5; Civ Eng (Lond) v 39 n 452 Feb 1944 p 39-41)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Repair of bombed railway viaduct


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Erscheinungsdatum :

    1944


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1944


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1943


    Repair of bombed railway viaduct

    Engineering Index Backfile | 1943


    The Day Japan Bombed Oregon

    Goyer, Norm | Online Contents | 2011


    Columns - Now that the Dots Have Bombed...

    Schroer, Ron | Online Contents | 2001