Illustrated description of effect of bombing and repair of viaduct on Southern Railway near Brighton; it is constructed of brick and consists of 27 arches; it took about 18 mo to complete and contains 8,000,000 bricks; rails are at height of about 70 ft above ground level; heavy bomb caused collapse of pier and of two arches which it supported; method of repair. (See also Engineer v 176 n 4588 Dec 17 1943 p 484-5; Ry Gaz v 80 n 1 Jan 7 1944 p 17-8, 22; Civ Eng (Lond) v 39 n 452 Feb 1944 p 39-41)
Repair of bombed railway viaduct
Engineering
Engineering ; 156 , n 4066
1943
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Online Contents | 2011
|Columns - Now that the Dots Have Bombed...
Online Contents | 2001
|