Illustrated description of effect of bombing and repair of viaduct on Southern Railway near Brighton; it is constructed of brick and consists of 27 arches; it took about 18 mo to complete and contains 8,000,000 bricks; rails are at height of about 70 ft above ground level; heavy bomb caused collapse of pier and of two arches which it supported; method of repair. (See also Engineering v 156 n 4066 Dec 17 1943 p 487-8, (illustrations) 490; Ry Gaz v 80 n 1 Jan 7 1944 p 17-8, 22; Civ Eng (Lond) v 39 n 452 Feb 1944 p 39-41)
Repair of bombed railway viaduct
Engineer
Engineer ; 176 , n 4588
1943
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
The repair of la voulte cast-iron railway viaduct
Engineering Index Backfile | 1925
Railway viaduct inspection equipment
Engineering Index Backfile | 1957