50-year old 2-mi long viaduct of railway from Rotterdam-Hofplein to Hague was constructed as continuous reinforced concrete hollow box girder; viaduct examined thoroughly because of many cracks found in structure; main structure is still in god condition, but new deck slab of prestressed concrete is necessary. (See also - n 33 Aug 15 1958 p Bt 85-89)
Inspection of railway viaduct in Rotterdam
Onderzoekingen aan een spoorwegviaduct te Rotterdam
Ingenieur ; 70 , n 37
1958
6 pages
Article (Journal)
Dutch
© Metadata Copyright Elsevier B. V. All rights reserved.
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Repair of bombed railway viaduct
Engineering Index Backfile | 1943
Repair of bombed railway viaduct
Engineering Index Backfile | 1944
Railway improvements in Rotterdam
Engineering Index Backfile | 1909
|