Details pertaining to reconditioning of two ship ways, Nos. 8 and 9 by Bethlehem Steel Co, Shipbuilding Division; extension of existing track system; new 25-ton Diesel locomotive crane added; air lines, water lines and electric cables extended; 4 specially designed cranes, each of 22 1/2 tons capacity on 20-ft tracks built; four 1500-amp welding generators, and bar heating furnace 3 ft wide and 65 ft long installed; etc. (see also Mar News v 27 n 2 July 1940 p 38-9)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New ways at sparrows point yard


    Additional title:

    Mar Eng Shipg Rev



    Publication date :

    1940


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    New ways at sparrows point yard

    Engineering Index Backfile | 1940


    Sparrows Point set to fly again

    Watson, David | Online Contents | 1997


    Handling shipyard traffic at sparrows point

    Palmer, L.H. | Engineering Index Backfile | 1920


    SPATZ - Sparrows over Haute-Savoie

    Mundwyler, Arthur | IuD Bahn | 2005


    Scanning, pecking and alarm flights in house sparrows

    Elgar, Mark A. / McKay, Helen / Woon, Peter | Elsevier | 1986