Details pertaining to reconditioning of two ship ways, Nos. 8 and 9 by Bethlehem Steel Co, Shipbuilding Division; extension of existing track system; new 25-ton Diesel locomotive crane added; air lines, water lines and electric cables extended; 4 specially designed cranes, each of 22 1/2 tons capacity on 20-ft tracks built; four 1500-amp welding generators, and bar heating furnace 3 ft wide and 65 ft long installed; etc. (See also Mar Eng and Shipg Rev v 45 n 6 June 1940 p 61-2)
New ways at sparrows point yard
Mar News
Marine News ; 27 , n 2
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New ways at sparrows point yard
Engineering Index Backfile | 1940
Sparrows Point set to fly again
Online Contents | 1997
|Handling shipyard traffic at sparrows point
Engineering Index Backfile | 1920
|SPATZ - Sparrows over Haute-Savoie
IuD Bahn | 2005
|