Details pertaining to reconditioning of two ship ways, Nos. 8 and 9 by Bethlehem Steel Co, Shipbuilding Division; extension of existing track system; new 25-ton Diesel locomotive crane added; air lines, water lines and electric cables extended; 4 specially designed cranes, each of 22 1/2 tons capacity on 20-ft tracks built; four 1500-amp welding generators, and bar heating furnace 3 ft wide and 65 ft long installed; etc. (see also Mar News v 27 n 2 July 1940 p 38-9)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New ways at sparrows point yard


    Weitere Titelangaben:

    Mar Eng Shipg Rev



    Erscheinungsdatum :

    1940


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    New ways at sparrows point yard

    Engineering Index Backfile | 1940


    Sparrows Point set to fly again

    Watson, David | Online Contents | 1997


    Handling shipyard traffic at sparrows point

    Palmer, L.H. | Engineering Index Backfile | 1920


    SPATZ - Sparrows over Haute-Savoie

    Mundwyler, Arthur | IuD Bahn | 2005


    Scanning, pecking and alarm flights in house sparrows

    Elgar, Mark A. / McKay, Helen / Woon, Peter | Elsevier | 1986