1–50 of 59 hits
|

    Wheel/rail impact: P1 and P2 force

    Zarembski, Allan M. | IuD Bahn | 1995

    Transitions eliminate impact at crossing

    Zarembski, Allan M. / Palese, Joseph | IuD Bahn | 2003

    Track modulus and degradation

    Zarembski, Allan M. | IuD Bahn | 1994

    Track maintenance costing: Issues and alternative

    Zarembski, Allan M. | IuD Bahn | 1994

    The effects of heavy axle loads on turnout maintenance

    Zarembski, Allan M. | IuD Bahn | 1995

    The effect of traffic windows on maintenance cost

    Zarembski, Allan M. | IuD Bahn | 1994

    The economics of Increasing Axle Load

    Zarembski, Allan M. | IuD Bahn | 1998

    Subgrade problem

    Part 1: Contributing factor
    Zarembski, Allan M. | IuD Bahn | 1995

      Subgrade problem

      Part 2: Causes and mechanism
      Zarembski, Allan M. | IuD Bahn | 1995

    Stochastic Analysis of Transit Wheel Wear and Optimized Forecasting of Wheel Maintenance Requirements

    Palese, Joseph W. / Zarembski, Allan M. / Ebersole, Kyle | British Library Conference Proceedings | 2019

    Sight-distance requirements at grade crossing

    Zarembski, Allan M. | IuD Bahn | 1995

    Scheduling rail testing: Sensitivities and guideline

    Zarembski, Allan M. | IuD Bahn | 1994

    Relationship between wood-tie properties and drying method

    Tracking R&D
    Zarembski, Allan M. | IuD Bahn | 1994

    Relationship Between Missing Ballast and Development of Track Geometry Defects

    Zarembski, Allan M. / Grissom, Gregory T. / Euston, Todd L. et al. | Online Contents | 2015

    Rating railroad bridge

    Zarembski, Allan M. | IuD Bahn | 1994

    Rail replacement criteria

    Zarembski, Allan M. | IuD Bahn | 1993

    Rail corrugations on transit system

    Zarembski, Allan M. | IuD Bahn | 1994

    Probabilistic Approach for Development of Track Geometry Defects as a Function of Ground Penetrating Radar Measurements

    Yurlov, Denis / Zarembski, Allan M. / Attoh-Okine, Nii et al. | Online Contents | 2019

    On the Use of Ballast Inspection Technology For the Management of Track Substructure

    Zarembski, Allan M. / Grissom, Gregory T. / Euston, Todd L. | Online Contents | 2014

    Monitoring grinding effectivene

    Zarembski, Allan M. / Palese, Joseph W. / Euston, Todd | IuD Bahn | 2005

    Mixed-traffic method

    Zarembski, Allan M. | IuD Bahn | 2011

    Measuring lubrication effectivene

    Zarembski, Allan M. | IuD Bahn | 1995

    Managing the wheel/rail interface with grinding

    Zarembski, Allan M. | IuD Bahn | 2011

    Managing risk improves track safety

    Zarembski, Allan M. / Palese, Joseph W. | IuD Bahn | 2005

    Managing risk boosts track safety

    Zarembski, Allan M. / Palese, Joseph W. | IuD Bahn | 2007

    Management of total rail grinding proce

    Zarembski, Allan M. | IuD Bahn | 2011

    Lehren aus den Erfahrungen der nordamerikanischen Bahnen mit dem intermodalen Verkehr

    Zusammenführung von Ingenieurtechnik und strategischer Geschäftsplanung
    Blaze, Jame / Zarembski, Allan M. | IuD Bahn | 2004

    Lateral track strength and resistance to track shift

    Zarembski, Allan M. | IuD Bahn | 1995

    JRC2022-79586 Forecasting Track Geometry Degradation Using GPR Based Ballast Condition

    Zarembski, Allan M. / Palese, Joseph W. / Nguyen, Mike | TIBKAT | 2022

    Investigation of the Correlation Between Track Geometry Defect Occurrence and Wood Tie Condition

    Alsahli, Ali / Zarembski, Allan M. / Palese, Joseph W. et al. | Online Contents | 2019

    Increasing Speeds Through the Diverging Route of a Turnout Without Increasing Lead Length

    Bonaventura, Clifford S. | Online Contents | 2004
    Contributors: Zarembski, Allan M.

    Improving rail steels: New approache

    Zarembski, Allan M. | IuD Bahn | 1994

    Improving inspection of turnout

    Zarembski, Allan M. | IuD Bahn | 2013

    High-speed rail grinding and metal removal

    Zarembski, Allan M. | IuD Bahn | 2012

    Heavy-axle-load effects on bridge

    Zarembski, Allan M. | IuD Bahn | 1995

    Heavier axle loads prove economic

    Zarembski, Allan M. | IuD Bahn | 1998

    Hand-held computers earn place on track

    Zarembski, Allan M. | IuD Bahn | 2006

    Guidelines for broken-rail risk

    Zarembski, Allan M. | IuD Bahn | 2009

    Grinding as part of rail management strategy

    Zarembski, Allan M. | IuD Bahn | 2008

    Gestion du risque de rupture du rail

    Zarembski, Allan M. / Palese, Joseph W. | IuD Bahn | 2006

    Geosynthetics in reinforced soil structure

    Zarembski, Allan M. | IuD Bahn | 1993

    Factors involved in turnout maintenance

    Zarembski, Allan M. | IuD Bahn | 1995

    Economics of wheel impact loading

    Zarembski, Allan M. | IuD Bahn | 1995

    Economics of rail maintenance for passenger operation

    Zarembski, Allan M. | IuD Bahn | 1994

    Does rail grinding reduce rail defect

    Zarembski, Allan M. / Palese, Joseph | IuD Bahn | 2011