The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear powered ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Nuclear Powered Tanker. Maritime Design Study for 600,000 DWT Nuclear Tanker. Volume 2. Preliminary Design


    Publication date :

    1975


    Size :

    236 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English