The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear power ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant.
Nuclear Powered Tanker. Maritime Design Study for 600,000 DWT Nuclear Tanker. Volume 4. Engineering and Production Support
1975
170 pages
Report
No indication
English