The study extended over a period of approximately six months. In terms of budgetary estimates, an economic evaluation was performed for ship construction cost, ship refueling and drydocking cost, first of a kind ship construction cost, ship manning cost, and contingencies. Additionally, recommendations are made as a result of the ship safety studies.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Nuclear Powered Tanker. Maritime Design Study for 600,000 DWT Nuclear Tanker. Volume 3. Ship Safety


    Publication date :

    1975


    Size :

    379 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English