The U.S. Army Mobility Equipment Research and Development Center has designed, fabricated, and tested a mooring-construction system in which each component is transportable in a C-130 aircraft. The function of the system is to bestablish a mooring capable of accommodating a T-2 tanker (16,500 DWT) or a T-5 tanker (25,000 DWT) at an offshore location while bulk fuel is discharged through pipelines or hoselines to onshore storage facilities. The system is designed for beach-to-sea installation within 48 hours after arriving at the beach worksite. (Author)
Air Transportable Mooring-Construction System for T-5 Tankers
1971
156 pages
Report
No indication
English
Bow mooring for berthing tankers
Engineering Index Backfile | 1964
|Model experiments on mooring of large tankers
Engineering Index Backfile | 1959
|Design of a Military, Mono-Mooring System for Tankers
NTIS | 1969
|Hydrodynamic analysis of tankers at single-point-mooring-systems
Tema Archive | 1979
|