The U.S. Army Mobility Equipment Research and Development Center has designed, fabricated, and tested a mooring-construction system in which each component is transportable in a C-130 aircraft. The function of the system is to bestablish a mooring capable of accommodating a T-2 tanker (16,500 DWT) or a T-5 tanker (25,000 DWT) at an offshore location while bulk fuel is discharged through pipelines or hoselines to onshore storage facilities. The system is designed for beach-to-sea installation within 48 hours after arriving at the beach worksite. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Air Transportable Mooring-Construction System for T-5 Tankers


    Beteiligte:
    H. C. Mayo (Autor:in)

    Erscheinungsdatum :

    1971


    Format / Umfang :

    156 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Model experiments on mooring of large tankers

    Vossers, G. | Engineering Index Backfile | 1959


    Hydrodynamic analysis of tankers at single-point-mooring-systems

    Faltinsen, O.M. / Kjaerland, O. / Liapis, N. et al. | Tema Archiv | 1979




    FLOATING CONSTRUCTION WITH MOORING SYSTEM AND MOORING METHOD

    VARTDAL HARALD | Europäisches Patentamt | 2021

    Freier Zugriff