Results of six borings made in Arlington, Virginia at the location of the proposed Court House Station of Vienna Route of the Washington Metropolitan Area Metro System are summarized in the report. It contains a geological section through the borings, logs of the borings, laboratory test results and conclusions regarding subsurface conditions. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite