Results of 17 borings performed in Sections K004 and K005 of Vienna Route are summarized. The investigations were made to determine conditions at locations where the subway line intersects adjacent highways and roadways. The report contains geological sections through the borings, logs of the borings, results of laboratory tests on undisturbed soil samples and conclusions regarding subsoil properties. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite