The project involves the improvement of Route 8 between the vicinity of North Street in Seymour and the vicinity of Route 63 in Naugatuck, Connecticut, a distance of 5.8 miles. The proposed improvement will divert a high volume of through traffic from Beacon Falls Center, improving the safety of motorists and pedestrians. Approximately 55 families and 7 commercial properties will be affected by this project. The taking of less than twenty acres of the total 3338 acres of the Naugatuck State Forest in Beacon Falls and Naugatuck will be required.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Improvement of Route 8 Vicinity of North Street in Seymour to Vicinity of Route 63 in Naugatuck, Conn. Project No. 124-112, Connecticut


    Publication date :

    1972


    Size :

    96 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    Ansonia-Derby Local Protection Project, Naugatuck and Housatonic Rivers, Connecticut: Hydraulic Model Investigation

    Pickering, Glenn A. / Murphy, Thomas E. / United States. Army. Corps of Engineers. Little Rock District. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1969

    Free access


    The street railways of Buffalo and vicinity

    Engineering Index Backfile | 1901