The project involves the improvement of Route 8 between the vicinity of North Street in Seymour and the vicinity of Route 63 in Naugatuck, Connecticut, a distance of 5.8 miles. The proposed improvement will divert a high volume of through traffic from Beacon Falls Center, improving the safety of motorists and pedestrians. Approximately 55 families and 7 commercial properties will be affected by this project. The taking of less than twenty acres of the total 3338 acres of the Naugatuck State Forest in Beacon Falls and Naugatuck will be required.
Improvement of Route 8 Vicinity of North Street in Seymour to Vicinity of Route 63 in Naugatuck, Conn. Project No. 124-112, Connecticut
1972
96 pages
Report
Keine Angabe
Englisch
HENRY – Bundesanstalt für Wasserbau (BAW) | 1969
|The street railways of Buffalo and vicinity
Engineering Index Backfile | 1901