Results are summarized herein of twelve borings plus eight replacement borings made between Stations 10+00 and 27+00 of the planned access road to the Anacostia Station regional parking facility. The work also includes a group of three supplementary borings plus three replacement borings made between Stations 176+00 and 177+50 in Section F005a of F-Route. The results of this latter investigation were summarized in a letter to WMATA, dated April 16, 1990. Also included are logs of the test borings, results of the laboratory tests on soil samples and comments on potential design and construction problems.
Anacostia Station Access Road: Supplementary Subsurface Investigation. Report No. 6
1990
169 pages
Report
No indication
English
Soil & Rock Mechanics , Highway Engineering , Transportation & Traffic Planning , Subsurface investigations , Soil mechanics , Access roads , Rock mechanics , District of Columbia , Subgrades , Exploration , Soil-structure interactions , Urban transportation , Boreholes , Borings , Geotechnical engineering