Results are summarized herein of twelve borings plus eight replacement borings made between Stations 10+00 and 27+00 of the planned access road to the Anacostia Station regional parking facility. The work also includes a group of three supplementary borings plus three replacement borings made between Stations 176+00 and 177+50 in Section F005a of F-Route. The results of this latter investigation were summarized in a letter to WMATA, dated April 16, 1990. Also included are logs of the test borings, results of the laboratory tests on soil samples and comments on potential design and construction problems.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Anacostia Station Access Road: Supplementary Subsurface Investigation. Report No. 6


    Publication date :

    1990


    Size :

    169 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English