Results are summarized of a series of environmental borings and supplementary deep test borings in the Anacostia River. Also included is a summary of a series of hollow-stem auger holes made to investigate the presence of obstructions in the ground, and the results of four full-scale deep-well pumping tests. The exploration was carried out along a portion of the subway line between the west Navy Yard on the north and Anacostia Drive on the south. This investigation pertains to the Washington Metropolitan Area Metro System.
Subsurface Investigation, Section F004, Anacostia River Crossing, Branch Route
1981
160 pages
Report
No indication
English
Civil Engineering , Geology & Geophysics , Subsurface investigations , Subway railways , Routes , Rock mechanics , Tunneling(Excavations) , Subsurface structures , Borings , Anacostia River , District of Columbia , Maryland , Virginia , Foundation engineering , Branch Route , Design section F004 , NTISWMATA