Results are summarized of a series of environmental borings and supplementary deep test borings in the Anacostia River. Also included is a summary of a series of hollow-stem auger holes made to investigate the presence of obstructions in the ground, and the results of four full-scale deep-well pumping tests. The exploration was carried out along a portion of the subway line between the west Navy Yard on the north and Anacostia Drive on the south. This investigation pertains to the Washington Metropolitan Area Metro System.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Subsurface Investigation, Section F004, Anacostia River Crossing, Branch Route


    Publication date :

    1981


    Size :

    160 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English