Results are summarized of a series of environmental borings and supplementary deep test borings in the Anacostia River. Also included is a summary of a series of hollow-stem auger holes made to investigate the presence of obstructions in the ground, and the results of four full-scale deep-well pumping tests. The exploration was carried out along a portion of the subway line between the west Navy Yard on the north and Anacostia Drive on the south. This investigation pertains to the Washington Metropolitan Area Metro System.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Subsurface Investigation, Section F004, Anacostia River Crossing, Branch Route


    Erscheinungsdatum :

    1981


    Format / Umfang :

    160 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch