This document has been prepared in order to demonstrate the capability of the collector subsystem to operate as a stand alone system, to demonstrate the capability of the Heliostat Array Controller (HAC) to control the heliostat field, and to satisfy prerequisite HAC control and command responses in support of pre-operational testing. (ERA citation 09:030540)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Collector Subsystem, Collector System Functional Test: Test Procedure 111. Revision 1


    Contributors:
    G. R. Rose (author)

    Publication date :

    1981


    Size :

    269 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English