This Collector Subsystem Integrated Acceptance Test Plan presents the Peoperational testing, the interfaces of the Collector Subsystem integrated with the Plant Control System, and technical support requirements to conduct the startup and Acceptance Testing. (ERA citation 09:043134)
10 MWe Solar Pilot Plant. Collector Subsystem Integrated Acceptance Test Plan
1981
8 pages
Report
No indication
English