This Phase II Collector Subsystem Functional Test Plan presents the functional testing to be performed to demonstrate the readiness of the Collector Subsystem for the Integrated Acceptance Tests. The functional testing will be performed with the collector subsystem as a stand-alone subsystem. In this context, all heliostat operational commands will be issued from the Heliostat Array Controller (HAC) and heliostat responses will be verified by visual means and from the HAC status displays. (ERA citation 09:043133)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    10 MWe Solar Thermal Central Receiver Pilot Plant. Collector Subsystem Functional Test Plan


    Publication date :

    1981


    Size :

    11 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English