This Phase II Collector Subsystem Functional Test Plan presents the functional testing to be performed to demonstrate the readiness of the Collector Subsystem for the Integrated Acceptance Tests. The functional testing will be performed with the collector subsystem as a stand-alone subsystem. In this context, all heliostat operational commands will be issued from the Heliostat Array Controller (HAC) and heliostat responses will be verified by visual means and from the HAC status displays. (ERA citation 09:043133)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    10 MWe Solar Thermal Central Receiver Pilot Plant. Collector Subsystem Functional Test Plan


    Erscheinungsdatum :

    1981


    Format / Umfang :

    11 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch