Results of eleven additional borings in the northern portion of Huntington Route between South Hayes Street and National Airport are summarized in the report. It contains a series of geological sections along the subway revised to include these additional borings, logs of the borings, results of laboratory tests performed on undisturbed samples and conclusions regarding subsoil properties. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Adopted Regional System - Subsurface Investigation. Huntington Route, S. Hayes St. to National Airport


    Publication date :

    1969


    Size :

    41 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English