The proposed project consists of the addition of one lane in each direction to provide a six-lane freeway. The length of the project is 9.6 miles. The construction of this project will require the displacement of two families and one business. A temporary increase in noise, dust, and inconvenience to traffic during construction can not be avoided.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Interstate Highway 35E, From 0.6 Mile North of Whitlock Lane, to 1.1 Mile South of Hickory Creek Bridge, Dallas and Denton Counties, Texas


    Publication date :

    1971


    Size :

    15 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English