The Payload Fairing Air Conditioning System (PLF A/C) comprises the generating units and distribution network terminating at the interface connections with the Payload Fairing Conditioned Air Umbilical and Disconnect System. This report presents the performance/design requirements. The equipment configuration of the PLF A/C System shall include, but not be limited to, the following items: (a) Water Chillers/Condensers, (b) Cooling Towers, (c) Air Conditioning Units, (d) Chilled and Condenser Water Pumps, (e) Water Piping System, (f) Air Distribution System, (g) Control System. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Contract End Item Detail Specification. Part I. Performance/Design and Qualification Requirements Air Conditioning System, Payload Fairing


    Publication date :

    1968


    Size :

    44 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English