The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak


    Publication date :

    1972


    Size :

    16 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English