In view of the missile discharging, emergency repair, obstacle clearing and transportation tasks in the airport runway after the attack. This article analyzes the complexity of the bomb ejection and repair task under the set conditions, and uses the principle of optimal timeliness to quickly complete the airport runway. For bomb discharge and emergency repair tasks, an ant colony algorithm-based equipment joint scheduling method for airport bomb discharge and emergency repair is proposed. This method divides airport equipment scheduling into task scheduling and path planning, and establishes a mathematical model for task scheduling. Ant colony algorithm for task scheduling path planning, and finally performs real-time simulation verification. Experiments show that the method is highly feasible after the airport is attacked, and it can meet the needs of rapid blasting and repairing of the airport in wartime.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Research on Equipment Joint Scheduling for Airport Bomb Disposal and Emergency Repair


    Contributors:
    Chao, Jin (author) / Changfei, Cui (author) / Fei, Teng (author) / Jin, Jiang (author) / Chunxiao, Fu (author) / Tianxiang, Qu (author) / Yuhua, Di (author) / Shouzhao, Sheng (author)


    Publication date :

    2021-08-27


    Size :

    1407672 byte




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English



    Emergency organisation for bomb damage repair

    Edrich, A.C. | Engineering Index Backfile | 1942



    Airport Gate Scheduling Joint Optimization Problems Study Progress

    Lian, Guan / Zhang, Xiaoyue / Hao, Siqi | Springer Verlag | 2024


    Emergency airport power

    Engineering Index Backfile | 1953


    Road emergency disposal site planning and resource scheduling system

    HU YANBIN / LIU JUN / HU WEICHAO et al. | European Patent Office | 2020

    Free access