In view of the missile discharging, emergency repair, obstacle clearing and transportation tasks in the airport runway after the attack. This article analyzes the complexity of the bomb ejection and repair task under the set conditions, and uses the principle of optimal timeliness to quickly complete the airport runway. For bomb discharge and emergency repair tasks, an ant colony algorithm-based equipment joint scheduling method for airport bomb discharge and emergency repair is proposed. This method divides airport equipment scheduling into task scheduling and path planning, and establishes a mathematical model for task scheduling. Ant colony algorithm for task scheduling path planning, and finally performs real-time simulation verification. Experiments show that the method is highly feasible after the airport is attacked, and it can meet the needs of rapid blasting and repairing of the airport in wartime.
Research on Equipment Joint Scheduling for Airport Bomb Disposal and Emergency Repair
27.08.2021
1407672 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Emergency organisation for bomb damage repair
Engineering Index Backfile | 1942
|Bomb detection and neutralization techniques for airport security
Tema Archiv | 1978
|Airport Gate Scheduling Joint Optimization Problems Study Progress
Springer Verlag | 2024
|Engineering Index Backfile | 1953
Road emergency disposal site planning and resource scheduling system
Europäisches Patentamt | 2020
|