A construction arrangement of an elevator and a method for constructing an elevator. The construction arrangement of an elevator comprises a hoistway (2); at least one car guide rail (3) and at least one counterweight guide rail (7) mounted to the structure of the hoistway (2); an elevator car (5) arranged movable on said at least one car guide rail; a counterweight (8) arranged movable on said at least one counterweight guide rail; and a hoisting machine (6) arranged above the counterweight (8); wherein the hoisting machine (6) is mounted substantially between said at least one car guide rail (3) and said at least one counterweight guide rail (7). The method for constructing an elevator comprising providing saidconstruction arrangement, moving the hoisting machine (6) from a first installation position (I) to an upper second installation position (II) in the hoistway (2), and mounting the hoisting machine (6) substantially between said at least one car guide rail (3) and said at least one counterweight guide rail (7).

    Agencement de construction d'un ascenseur et procédé de construction d'un ascenseur. L'agencement de construction d'un ascenseur comprend une cage d'ascenseur (2) ; au moins un rail de guidage de cabine (3) et au moins un rail de guidage de contrepoids (7) monté sur la structure de la cage d'ascenseur (2) ; une cabine d'ascenseur (5) agencée mobile sur ledit au moins un rail de guidage de cabine ; un contrepoids (8) agencé mobile sur ledit au moins un rail de guidage de contrepoids ; et une machine de levage (6) agencée au-dessus du contrepoids (8) ; la machine de levage (6) étant montée sensiblement entre ledit au moins un rail de guidage de cabine (3) et ledit au moins un rail de guidage de contrepoids (7). Le procédé de construction d'un ascenseur comprend la fourniture dudit agencement de construction, le déplacement de la machine de levage (6) d'une première position d'installation (I) à une seconde position d'installation supérieure (II) dans la cage d'ascenseur (2) et le montage de la machine de levage (6) sensiblement entre ledit au moins un rail de guidage de cabine (3) et ledit au moins un rail de guidage de contrepoids (7).


    Access

    Download


    Export, share and cite



    Title :

    CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD FOR CONSTRUCTING AN ELEVATOR


    Additional title:

    AGENCEMENT DE CONSTRUCTION D'UN ASCENSEUR ET PROCÉDÉ DE CONSTRUCTION D'UN ASCENSEUR


    Contributors:
    KUKKOLA MIKKO (author) / IJÄS MIKA (author) / RÄSÄNEN MATTI (author) / HAAPANIEMI MARKKU (author) / LANZ OTTO (author) / LAINE JANNE (author)

    Publication date :

    2023-05-19


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B66B Aufzüge , ELEVATORS



    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2024

    Free access

    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2022

    Free access

    Method of constructing elevator and elevator arrangement during construction

    RASANEN MATTI / HAAPANIEMI MARKKU / OLA LANTZ et al. | European Patent Office | 2023

    Free access

    ELEVATOR ARRANGEMENT AND METHOD OF CONSTRUCTING ELEVATOR

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / HAIKONEN AKI et al. | European Patent Office | 2023

    Free access

    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RASANEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2023

    Free access