The invention relates to a method of constructing an elevator, comprising: providing an elevator car (1; 51; 1 '), the elevator car (1; 51; 1 ') comprises a car frame (3; 53; 3 ') which is detachably mounted on the car frame (3; 53; 3 ') on the temporary pulley beam (4; 4 '); installing the hoist (5) in a first position (I), the first position (I) being at a first vertical level in the hoistway (2); via the temporary pulley beam (4; 4 ') is suspended from the hoist (5) using a hoisting rope (6); 51; 1 '); when the elevator (5) is in the first position (I) and via the temporary pulley beam (4; 4 ') is suspended by the rope (6), moving the elevator car (1; 4') in the hoistway (2) using the hoist (5); 51; 1 '); the elevator (5; 5 ') in a second position (II) at a second higher vertical level in the machine room (7) located above the hoistway (2); from the elevator car (1; 51; 1 ') to remove the temporary pulley beam (4; 4 '), comprising at least one side from the car frame (3; 53; 3 ') detaching the temporary pulley beam (4, 4'); 3 ') via the car frame (3; 53; 3 ') without the temporary pulley beam (4; 4 '), using a lifting rope (6; 6 ') mounted at the second position (II) from the elevator (5; 5 ') suspended in the car (1; 51; 1 '); when the elevator (5; 5 ') is in the second position (II) and the car (1; 51; 1 ') does not require the temporary pulley beam (4; 4 ') via the car frame (3; 53; 3 ') is suspended using the hoister (5; 5 ') in the hoistway (2), the elevator car (1; 51; 1 '). The invention also relates to an elevator arrangement for implementing the method.

    本发明涉及一种构造电梯的方法,包括:在井道(2)中提供电梯轿厢(1;51;1'),上述电梯轿厢(1;51;1')包括轿厢框架(3;53;3')和可拆卸地安装在轿厢框架(3;53;3')上的临时滑轮梁(4;4');将提升机(5)安装在第一位置(I),第一位置(I)处于井道(2)中的第一竖直水平;经由上述临时滑轮梁(4;4')使用提升绳索(6)从提升机(5)悬置电梯轿厢(1;51;1');当所述提升机(5)处于上述第一位置(I)并且经由上述临时滑轮梁(4;4')通过所述绳索(6)被悬置时,使用所述提升机(5)在所述井道(2)中移动所述电梯轿厢(1;51;1');将提升机(5;5')安装在第二位置(II),所述第二位置(II)处于位于井道(2)上方的机房(7)内的第二较高竖直水平;从电梯轿厢(1;51;1')移除临时滑轮梁(4;4'),包括从轿厢框架(3;53;3')拆卸临时滑轮梁(4,4');经由上述轿厢框架(3;53;3')而不用上述临时滑轮梁(4;4'),使用提升绳索(6;6')从安装在上述第二位置(II)的提升机(5;5')悬置轿厢(1;51;1');当提升机(5;5')处于上述第二位置(II)并且轿厢(1;51;1')不用上述临时滑轮梁(4;4')而经由上述轿厢框架(3;53;3')被悬置时,使用提升机(5;5')在所述井道(2)中移动所述电梯轿厢(1;51;1')。本发明还涉及用于实现该方法的电梯装置。


    Access

    Download


    Export, share and cite



    Title :

    Method of constructing elevator and elevator arrangement during construction


    Additional title:

    构造电梯的方法和构造时的电梯装置


    Contributors:

    Publication date :

    2023-10-10


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66B Aufzüge , ELEVATORS



    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2022

    Free access

    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2024

    Free access

    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    RASANEN MATTI / HAAPANIEMI MARKKU / LANZ OTTO et al. | European Patent Office | 2023

    Free access

    ELEVATOR ARRANGEMENT AND METHOD OF CONSTRUCTING ELEVATOR

    RÄSÄNEN MATTI / HAAPANIEMI MARKKU / HAIKONEN AKI et al. | European Patent Office | 2023

    Free access

    ELEVATOR ARRANGEMENT AND METHOD FOR CONSTRUCTING ELEVATOR

    RÄSÄNEN MATTI / KUKKOLA MIKKO / HAAPANIEMI MARKKU et al. | European Patent Office | 2024

    Free access