To enable management of traffic demand between OD by calculating a plurality of routes and the route cost for distributing and adjusting the traffic demand between OD.SOLUTION: Disclosed is a traffic demand management device 1 for distributing traffic demand, which includes: a reception part 12 for receiving information on the traffic demand and a start point O and an end point D of the traffic demand; a route generation part 13 for generating a plurality of routes from the start point O to the end point D; a route cost calculation part 14 for calculating the route cost of each route to be varied in accordance with the traffic demand; and a route output part 15 for performing output by associating the generated route with the calculated route cost.SELECTED DRAWING: Figure 1
【課題】OD間の交通需要を分散・調整するための複数経路と経路コストを算出し、OD間の交通需要のマネジメントを可能にする。【解決手段】 交通需要を分散させる交通需要マネジメント装置1であって、交通需要および該交通需要の起点Oと終点Dの情報を受け付ける受付部12と、前記起点Oから前記終点Dへの経路を複数生成する経路生成部13と、前記交通需要に応じて変動する各経路の経路コストを算出する経路コスト算出部14と、生成した経路と算出した経路コストを対応づけて出力する経路出力部15と、を備える交通需要マネジメント装置。【選択図】図1
TRAFFIC DEMAND MANAGEMENT DEVICE AND TRAFFIC DEMAND MANAGEMENT SYSTEM
交通需要マネジメント装置、および、交通需要マネジメントシステム
2021-03-01
Patent
Electronic Resource
Japanese
Traffic Demand Management in Action
British Library Conference Proceedings | 1999
|Innovative Traffic Demand Management Strategy
Transportation Research Record | 2011
|TRAFFIC DEMAND PREDICTION SYSTEM AND TRAFFIC DEMAND PREDICTION DEVICE
European Patent Office | 2019
|TRAFFIC DEMAND PREDICTION DEVICE AND TRAFFIC DEMAND PREDICTION SYSTEM
European Patent Office | 2020
|European Patent Office | 2019
|