Provided is an elevator renewal construction method, with which a continuous elevator out-of-service period in an elevator renewal construction period can be shortened. An elevator renewal construction method includes: dividing a process of renewal construction work into a series of divided construction work steps, each being determined as such a unit that the elevator operation becomes normally possible after finishing of each of the divided construction work steps; and executing the renewal construction work in accordance with the series of divided construction work steps, wherein one of the series of the divided construction work steps comprises the steps of: replacing an old control panel of the existing elevator with a new control panel; connecting an old cable for an old car device, which has connected the old car device and the old control panel of the existing elevator to each other, to a communication conversion unit provided in the new control panel; and converting a new serial communication system to an old serial communication system by the new control panel via the communication conversion unit and the old cable to control the old car device through the old serial communication system.
ELEVATOR RENOVATION METHOD AND ELEVATOR CONTROL PANEL
AUFZUGSSANIERUNGSVERFAHREN UND AUFZUGSBEDIENFELD
PROCÉDÉ DE RÉNOVATION D'ASCENSEUR ET PANNEAU DE COMMANDE D'ASCENSEUR
2020-01-01
Patent
Electronic Resource
English
IPC: | B66B Aufzüge , ELEVATORS |
HYDRAULIC ELEVATOR RENOVATION METHOD AND ELEVATOR APPARATUS
European Patent Office | 2019
|