The invention discloses an urban road subsection construction organization method considering traffic influence and construction progress, which relates to the field of traffic planning and management, and specifically comprises the following steps: obtaining channelization data of the number of entrance and exit lanes and the passing direction of each intersection of a construction road, splitting the whole construction road into n construction road sections, carrying out channelization transformation on intersections of the construction road sections, determining road sections in which construction roads can be simultaneously closed in the regional road network, selecting a corresponding construction road section combination and a diversion intersection channelization transformation scheme according to the minimum average load degree of the affected road sections, and carrying out the construction of a first batch of construction road sections; and so on, the whole road construction efficiency is improved to the greatest extent on the premise of considering the traffic influence.

    本发明公开了一种考虑交通影响和施工进度的城市道路分路段施工组织方法,涉及交通规划与管理领域,具体获取施工道路各路口的进出口车道数量和通行方向的渠化数据,将整条施工道路拆分成n个施工路段,对施工路段的路口进行渠化改造,确定区域路网内施工道路能够同时封闭施工的路段,以受影响的路段平均负荷程度最小为依据选取对应的施工路段组合及分流路口渠化改造方案,进行第一批施工路段施工;以此类推直至全部施工路段施工完毕,在考虑交通影响的前提下最大程度地提高整体道路施工效率。


    Access

    Download


    Export, share and cite



    Title :

    Urban road subsection construction organization method considering traffic influence and construction progress


    Additional title:

    考虑交通影响和施工进度的城市道路分路段施工组织方法


    Contributors:
    ZHAO RUI (author) / MENG XITONG (author) / LI SHENGBING (author) / MENG XIANGYAN (author) / CHU XIAOLAN (author) / LIANG ZIJUN (author) / CAI XIAOFEI (author) / LI YUQI (author) / DONG MIN (author) / LIU HONGQUN (author)

    Publication date :

    2025-03-18


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    G08G Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs , TRAFFIC CONTROL SYSTEMS



    Urban road traffic demand prediction method considering road construction influence

    PENG QING / GONG HUATIAN / YANG XIAOGUANG | European Patent Office | 2025

    Free access

    Groove body subsection construction method and groove body subsection

    ZHANG CHAOHUAN / ZHOU FEI / YIN KE | European Patent Office | 2025

    Free access

    Container ship step subsection construction method and step subsection

    FENG JIAN / ZHI YINFENG / GAO PAN et al. | European Patent Office | 2024

    Free access

    Construction method of three-step type subsection

    ZHUANG JINGSONG / WU PEI / KE YUFANG et al. | European Patent Office | 2020

    Free access

    Construction method of semi-submerged ship side thrust subsection

    CHEN GUOREN / REN PING / XU ZHICONG et al. | European Patent Office | 2022

    Free access