The invention discloses a beam structure hoisting method. The beam structure hoisting method comprises the following steps that a base point structure is arranged on a building structure above a pre-hoisting layer; hoisting equipment is arranged on the base point structure; the beam structure is moved to the position above the hole; hoisting the beam structure to the pre-hoisting layer through hoisting equipment; wherein the pre-hoisting layer is a floor where the beam structure needs to be hoisted. According to the beam structure hoisting scheme, hoisting of the beam structure above the hole can be successfully achieved, and the safety in the hoisting process is improved.
本申请公开了一种梁结构吊装方法,包括如下步骤:在预吊装层的上方建筑结构设置基点结构;将起重设备设置于基点结构上;将梁结构移动至孔洞上方;通过起重设备将梁结构吊装至预吊装层;其中,预吊装层为梁结构需要吊装的楼层。本申请的梁结构吊装方案能够成功实现梁结构在孔洞上方的吊装,提高吊装过程中的安全性。
Beam structure hoisting method
梁结构吊装方法
2024-08-30
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |
Crane beam hoisting device, hoisting structure and hoisting method
European Patent Office | 2022
|Hoisting structure and hoisting method of asymmetric steel beam
European Patent Office | 2024
|HOISTING BEAM AND METHOD FOR MANUFACTURING HOISTING BEAM
European Patent Office | 2021
|Hoisting structure utilizing pergola beam and construction method of hoisting structure
European Patent Office | 2024
|