The embodiment of the invention relates to the field of rail transit, in particular to a train fault control method and device, electronic equipment and a storage medium. The method is applied to an ATS system and comprises the steps that the signal equipment state of a first train running in a target line is monitored, and the first train comprises two sets of signal equipment running independently; and under the condition that the single set of signal equipment of the first train breaks down, the other set of signal equipment is activated so that the first train can continue to run. According to the train fault control method provided by the invention, the problem of low manual adjustment efficiency when a train signal system has a single system fault can be solved.
本公开实施例涉及轨道交通领域,更具体地,涉及一种列车的故障控制方法、装置、电子设备及存储介质。应用于ATS系统,所述方法包括:监测目标线路中运行的第一列车的信号设备状态,所述第一列车包括两套独立运行的信号设备;在所述第一列车出现单套信号设备故障的情况下,激活另一套信号设备以供所述第一列车继续行驶。根据本发明所述的列车的故障控制方法,可以解决列车信号系统出现单系故障时,人工调整效率低下的问题。
Train fault control method, electronic equipment and storage medium
列车的故障控制方法、电子设备及存储介质
2024-06-21
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Train fault scheduling method, electronic equipment and storage medium
European Patent Office | 2024
|Train control method, electronic equipment and storage medium
European Patent Office | 2024
|Train control method, storage medium and electronic equipment
European Patent Office | 2024
|Train fault monitoring method and device, electronic equipment and storage medium
European Patent Office | 2024
|Train control method and device, train, storage medium and electronic equipment
European Patent Office | 2023
|