The invention discloses a superstructure assembly and an installation method thereof. The superstructure assembly comprises a steel enclosure bulkhead, reinforcing materials and water blocking horizontal iron, wherein the water blocking horizontal iron is connected to the at least two reinforcing materials, and the position of the water blocking horizontal iron can be adjusted in the vertical direction in relation to the steel enclosure bulkhead; in the superstructure assembly, the water blocking horizontal iron is connected to the reinforcing materials and can replace channel steel to play a reinforcing role, and the position of the water blocking horizontal iron can be adjusted in the vertical direction in relation to the steel enclosure bulkhead, so that the position of the water blocking horizontal iron can be adjusted after hoisting is finished, the effect of guiding condensate water through the water blocking horizontal iron can still be achieved, the dual use of the water blocking horizontal iron can be realized, and the defects that labor and time are wasted, hoisting weight is increased and welding resources are wasted due to utilization of channel steel for reinforcing are overcome.
本发明公开了一种上层建筑组件及其安装方法,该上层建筑组件包括钢围壁、附强材以及挡水平铁,将挡水平铁同时连接于至少两个附强材,并使挡水平铁沿竖直方向相对所述钢围壁的位置可调节,在该上层建筑组件中,将挡水平铁连接到附强材上,能够替代槽型钢起到加固作用,而挡水平铁沿竖直方向相对钢围壁的位置可调节,能够在吊装结束后,调节挡水平铁的位置,仍能实现利用挡水平铁对冷凝水进行引导的作用,实现挡水平铁的一物二用,避免使用槽型钢加固而带来的费工费时、增加吊装重量、浪费焊接资源的缺陷。
Superstructure assembly and installation method thereof
上层建筑组件及其安装方法
2021-10-12
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Ship superstructure translation crane installation method
European Patent Office | 2021
|Innovative track superstructure and catenary installation technology
IuD Bahn | 2004
|Method for over-limit installation of quay crane superstructure on gantry crane
European Patent Office | 2024
|