According to a large cruise ship sheet block internal temporary supporting method, toggle plates and round pipes are connected to form a supporting structure, and the supporting structure is preset ateach installation position of a ship body, so that the precision between an upper deck and a lower deck can be ensured while the stability of upper supporting and lower supporting is ensured, smoothconstruction is ensured; and, through repeated utilization of the toggle plates, Waste of consumables can be effectively reduced, and efficient operation of supporting work can be guaranteed under thecondition that the cost is controlled.
本发明公开了大型邮轮薄板总段内部临时支撑方法,以肘板和圆管的连接组成支撑结构,并在船体各安装位置预设支撑结构,能够在在确保上下支撑稳定性的同时,确保上下甲板之间的精度,确保建造顺利进行,并且通过肘板的重复利用,既能够有效减少耗材的浪费,又能够在控制成本的情况下,保证支撑工作的高效进行。
Large cruise ship sheet block internal temporary supporting method
大型邮轮薄板总段内部临时支撑方法
2021-01-08
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Construction method of cruise ship accommodation cabin block
European Patent Office | 2023
|